Stage 02 / 04

Turnkey installation

From an agreed design to a tested system: careful installation, electrical connections and a clear owner handover.

Koh Samui · Koh PhanganDiscuss your project
Turnkey installation
01

Installed equipment

02

Checked connections and protection

03

Configured system and monitoring

Scope of work

We coordinate installation on Koh Samui and Koh Phangan around site access, operations and existing infrastructure. The proposal defines the work scope and responsibilities.

01

Site preparation

We agree the schedule, equipment delivery and roof access. Mounting points, inverter and battery locations, cable paths and any necessary power interruptions are reviewed.

02

Installation & connections

We install mounting and panels, route cables and connect the inverter, storage and specified protection. Changes to the existing electrical installation are agreed separately when required.

03

Testing & commissioning

We check connections and settings, commission the equipment and test the scenarios specified in the design. Backup systems are tested on the agreed circuits. We then explain daily use to the owner.

CANVAS SPV

Different properties. A considered approach.

01

An operating property

Coordinate access, working areas and switching with management.

02

A new building

Align work with the readiness of the roof, electrical routes and technical spaces.

03

Owner handover

Explain settings and access after testing, so the system is clear to those who use it.

What shapes the system

A clear basis for your investment

Distinguish equipment, installation, electrical changes and commissioning in the estimate. The agreed scope defines what turnkey means for your property.

01

Site readiness

Roof, equipment positions and connection.

02

Work scope

Mounting, routes, protection and electrical changes.

03

Testing

Commissioning scenarios, backup and handover.

What you receive

  • Installed equipment
  • Checked connections and protection
  • Configured system and monitoring
  • Settings and operating guidance

Before we start

We need agreed access to the site, electrical board and installation areas. Work zones, noise restrictions and any power interruptions are planned in advance.

Questions about this stage

How long does installation take?

Timing depends on power, roof conditions, electrical work and access. The proposal states the project schedule.

Can you work at an operating resort?

Yes. We coordinate with the operations team and plan work areas and necessary power interruptions in advance.

Explore the other stages

01Engineering & design03Service & maintenance04Online monitoring

Koh Samui · Koh Phangan

Let’s start with your property.

Tell us about your property and priorities. We will identify the information needed for an informed proposal.

Discuss your project