Stage 01 / 04

Engineering & design

Understand the property first. Then design a system around its architecture, energy demand and backup requirements.

Koh Samui · Koh PhanganDiscuss your project
Engineering & design
01

A configuration matched to your property

02

Layout and connection plan

03

Generation and consumption estimate

Scope of work

We start with electricity bills, a site survey and a discussion of how the property is used. An evening-heavy villa and a resort operating around the clock need different configurations.

01

Energy assessment & site survey

We review available bills and day/night demand, inspect the roof, shading, electrical board and equipment locations. Together we identify the circuits that must stay powered during a grid outage.

02

System architecture

We select panel power, the inverter and usable battery capacity. Layout, mounting, cable routes and protection account for site constraints and possible expansion.

03

Calculation & proposal

The generation and savings estimate states its assumptions, including usage, tariff and available roof area. Equipment, work scope and terms are agreed in the proposal. A financial forecast is not a guarantee of future savings.

CANVAS SPV

Different properties. A considered approach.

01

An informed equipment choice

Understand why power and storage are selected, beyond a list of components.

02

Installation with a plan

Agree the layout and electrical scheme before work begins.

03

A basis for expansion

Discuss future demand in advance; expansion depends on the selected architecture.

What shapes the system

A clear basis for your investment

Compare proposals by the same scope: usable storage, backup circuits, protection and included work, as well as panel capacity.

01

Demand profile

When and how much energy the property uses.

02

Site conditions

Roof, shading, boards and access.

03

Priorities

Savings, backup and development plans.

What you receive

  • A configuration matched to your property
  • Layout and connection plan
  • Generation and consumption estimate
  • Agreed estimate and work scope

Before we start

Recent bills, roof and electrical-board photographs are useful. Building plans help us assess equipment locations more quickly.

Questions about this stage

Can we start without building plans?

Yes. Bills and photographs are enough for an initial discussion. Missing dimensions and technical details are checked during the survey.

When will the price be clear?

Once demand, backup circuits and installation conditions are understood. Final equipment and cost are agreed before work starts.

Explore the other stages

02Turnkey installation03Service & maintenance04Online monitoring

Koh Samui · Koh Phangan

Let’s start with your property.

Tell us about your property and priorities. We will identify the information needed for an informed proposal.

Discuss your project